RECONSTRUCTION PROJECT EXPERIENCE
Medical Center: Reconstruction of imported marble cladding with stainless steel flashings and upgraded waterproofing at a 4-story, 85,000 sf marble-clad medical/dental/cosmetic surgery building in La Jolla.
Beach Condominiums: $2 million, 5-year phased reconstruction of balconies, roofs, guardrails, elevated walkways, windows, siding, exposed heavy-timber framing, and mold & structural repairs at a 20 year-old, 4-story, 106-unit oceanfront condominium in La Jolla.
Desert Hotel: Reconstruction of roofs, balconies, walkways, guardrails, fire walls, shear walls and finishes, including extensive foam trim.

Inland Condominiums: 120-unit, 11 bldg reconstruction of roofs, skylights, chimneys, stairs, walkways & balconies, Santee.
Coast Condominiums: $70K reconstruction of a stair tower structurally damaged by water intrusion, Oceanside.
Downtown Condominiums: Reconstruction of roofs, stairs, balconies, walkways and carports for 78 units in 14 buildings, San Diego.
Ranch Condominiums: Repairs to mold and water damaged deck, framing and flashing, Oceanside.
Bernardo Condominium: Reconstruction of water-damaged exterior deck framing, rail and flashing, Rancho Bernardo.
Retaining Wall: $75K retaining wall waterproofing and drainage reconstruction project, Los Penasquitos.
Chino Hills Condominums: $734K reconstruction of roofs, windows and balconies at 72 condo units, Chino Hills.